This pool measures 7m (23ft) x 3.5m (11.5ft) and is 1.8m (5.9ft) in the deep end and 1.1m (3.6ft) in the shallow end. The pool itself holds about 38,000 litres (10,040 gallons) of water. There was approximately 21m³ (742ft³) of concrete used to construct the pool and cantilevered beam. The purpose of this beam was to support the weight of the block boundary wall.

Filmed using a GoPro Hero2 which was mounted on the side of the 'pool house' taking a photo every 30 seconds for 8-12 hours each working day. The filmed section of this project took over 3 months which included over 44 working days.

The costings for the pool including excavation and tipping fees, steel supply and labour, concrete supply and labour, rendering, tile supply and labour and pool equipment (filter etc) was approx. $30,000 AUD (21,000 USD).

This pool was an owner-built project which in the long run saved us approximately 50% of the price quoted to us by pool construction companies.

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...